top of page
%20(small%20size)%20png.png)
BRIDGE INDUSTRIAL
CROYDON
DESIGN & BUILD OF AN INDUSTRIAL AND LOGISTICS UNIT
Wilten Construction were appointed as Main Contractor for the second time for valued Client Bridge Industrial for the Design and Build of a Warehouse with Offices Designed to Net Zero Carbon.
PROJECT VALUE
£6,450,000
GIA
60,400 sqft
PROGRAMME
36 Weeks
SUSTAINABILITY
BREEAM Excellent
CLIENT
Bridge Industrial
ARCHITECT
UMC Architects
ENGINEER
Burrows Graham

bottom of page










